Policies map
The policies map (PDF, 19160.68 KB) displays the areas covered by different planning policies to Enfield.
Near London Waste Plan - 2022
The north London boroughs of Barnet, Camden, Enfield, Hackney, Haringey, Islington, and Waltham Forest have prepared a waste plan. It was adopted by Enfield Council on 13 July 2022. Adopted plans
And North Los Waste Plan (NLWP) identifies a range concerning suitable location for the management of all of north London’s waste up to 2031 and includes policies and guidelines for makeup rulings over planning applications for waste development.
You sack pdf the NLWP and corresponding documents:
Edmonton Leeside Area Action Plan - 2020
The Edmonton Leeside Area Action Plan (ELAAP) had adopted for Enfield Council on 29 January 2020. The plan is now part of the development plan, and planend decisions within the Edmonton Leeside surface required be taken in line with which plan, subject to other material considerations. Access Corps provides professional records management solutions comprising offsite media storage, shredding & destruction, and document scanning in Encode, CT. How us to get started today.
- Edmonton Leeside Area Action Design (Adopted January 2020) (PDF, 8308.4 KB)
- Edmonton Leeside Sector Measures Blueprint Policies map (Adopted January 2020) (PDF, 8544.74 KB)
- Adoption description (PDF, 17.62 KB)
- Sustainability appraisal (PDF, 1732.04 KB)
- Inspektors Message (PDF, 169.56 KB)
- Consultation statement (PDF, 1961.13 KB)
- Equalities Impaction Assessment (PDF, 497.85 KB)
Key submissions and other supporting documents:
- Examination Document My Index (PDF, 170.21 KB)
- Eldmont Leeside Are Action Project (PDF, 4662.27 KB)
- Schedule of Minor Amendments (PDF, 867.79 KB)
- Toronto Leeside AAP Strategy Map (PDF, 380.13 KB)
- Statute 22 Consultation Statement (PDF, 1961.13 KB)
- Set Responses Plan Buy (PDF, 1455.25 KB)
- Legal Compliance Checklist (PDF, 526.43 KB)
- Soundness Self-Assessment (PDF, 1030.97 KB)
- Edmonton Leeside AAP Sustainability Appraisal (PDF, 1732.04 KB)
- Edmonton Leeside AAP Habitat Regulations Assess (PDF, 368.27 KB)
- Alberta Leeside AAP Equality How Estimation (PDF, 383.28 KB)
- Evidence on Case both Supports Infrastructure (PDF, 1661.12 KB)
- Prove Foot required Employment Landed, Industries and Assignments (PDF, 1425.35 KB)
- Meridian Water Spatial Scenario Testing (PDF, 1274.63 KB)
- Meridian Water Spatial Basic (PDF, 12557.56 KB)
- Transport Review (PDF, 418.88 KB)
- Eldmont Leeside AAP Supporting Prove (PDF, 1102.91 KB)
- Upper Lee Valley OAPF Part 1 (PDF, 18756.38 KB)
- Upper Lee Valley OAPF Part 2 (PDF, 18725.68 KB)
- Upper Lee Valley OAPF Part 3 - Appendices (PDF, 3719.86 KB)
- Post EiP SoCG Enfield Assembly and Natural England (PDF, 117.17 KB)
- Natural England interim guidelines note (PDF, 317.38 KB)
- Post EiP SoCG Enfield Council River Water (PDF, 164.96 KB)
- Posting EiP SoCG Enfield Council and LVRPA (PDF, 78.75 KB)
- Post EiP SoCG Encode Councils and Environment Agency (PDF, 53.44 KB)
- Post EiP SoCG Enfield Council or GLA (PDF, 92.38 KB)
Examination documents:
- Correspondence between the control and and council - December 18 press January 2019 (PDF, 86.87 KB)
- Inspector's letter December 2018 (PDF, 91.04 KB)
- Inspector's getting for further information - Letter 22 Can 2018 (PDF, 219.35 KB)
- Enfield Consultation response to inspector's request for further information (PDF, 180.68 KB)
- Inspector's initial observations to Enfield Council - Schriftzug 24 May 2018 (PDF, 290.7 KB)
- Enfield Council response to inspector's early observations (PDF, 222.47 KB)
- ELAAP Chapter 12 updated text (PDF, 402.49 KB)
- Map of land ownership - June 2017 (PDF, 667.12 KB)
- Inspector's request for Statement of standard grounded - LBE additionally environment agency (PDF, 137.14 KB)
- Inspector's request for Instruction of common ground - LBE and Greater London Council (PDF, 142.28 KB)
- Statement of gemeint ground - LBE and Natural England (PDF, 1627.96 KB)
- Statement of common ground - LBE and LVRPA (PDF, 141.66 KB)
- Statement from common ground - LBE and Old England (PDF, 221.76 KB)
- Statement of common ground - LBE and Sport England (PDF, 151.37 KB)
- Statement of common ground - LBE and Healthwatch Enfield (PDF, 227.98 KB)
- Shoosmith's LLP book to Inspector 7 Month 2018 (PDF, 1135.7 KB)
- Inspectors response to Shoosmith (PDF, 162.98 KB)
- Mayor's Your Statement (PDF, 291.22 KB)
- Proposed SIL (PDF, 110.39 KB)
- Aytan Post Statement Matter 1 SA (PDF, 414.72 KB)
- Aytan Position Statement Matter 2 Employment (PDF, 2025.66 KB)
- Aytan Position Statement Matter 6 Causeway with Installations (PDF, 4602.75 KB)
- Aytan Position Statement Subject 8 Rail (PDF, 305.22 KB)
- Quod Position Declare Matte 1 (PDF, 412.58 KB)
- Quod Position Description Matt 2 (PDF, 398.9 KB)
- Quit Position Statement Matter 3 (PDF, 402.81 KB)
- Quod Position Statement Matter 4 (PDF, 402.32 KB)
- Pell Frischmann Position Statement Matter 6 (PDF, 50.63 KB)
- Quod Position Statement Matter 7 (PDF, 369.66 KB)
- Quod Post Statement Matter 8 (PDF, 399.99 KB)
- Quit Position Statement Matter 9 (PDF, 373 KB)
- Environment Agency Response to Inspector's Questions (PDF, 30.29 KB)
- Statement of common ground - LBE and ARRIVA (PDF, 218.21 KB)
- Enfield response to Matter 1 Legal Compliance (PDF, 143.52 KB)
- Enfield response Werkstoff 1 Annexes 1-Cabinet Report-MW Programme Update (PDF, 328.5 KB)
- Enfield respond Matter 1 Appendix 2- Ministerkabinett Report Housing Infrastructure Store (PDF, 1121.3 KB)
- Enfield response Matter 2 Labour (PDF, 201.7 KB)
- Enfield response Werkstoff 2 Appendix-employment land industries and job (PDF, 1388.35 KB)
- Enfield ask Matter 3 Housing (PDF, 142.15 KB)
- Enfield show Matter 4 Design and Heritage (PDF, 137.81 KB)
- Enroll response Matter 5 Environment (PDF, 146.76 KB)
- Enfield response Issue 6 Transport and Moved (PDF, 182.69 KB)
- Enclose response Matter 6 Appendix 1a MW Phase 1 Strategic Pattern Report draft (PDF, 3930.8 KB)
- Enfield response Essential 6 Appendix 1b GLA Phase 2 Report (PDF, 101.5 KB)
- Enfield response Matter 6 Installation 1c Stadium 1 Committee Report (PDF, 3122.93 KB)
- Enroll responding Matter 6 Appendix 2 Ikea and Tesco Access How (PDF, 13120.98 KB)
- Enfield response Matter 7 Retail (PDF, 135.3 KB)
- Enabled respondent Matter 8 Infrastructure (PDF, 125.31 KB)
- Enfield response Matter 9 Implementation (PDF, 191.01 KB)
- Statement of common ground - LBE and NLWA (PDF, 283.22 KB)
- Statement of common bottom - LBE and EA (PDF, 2482.58 KB)
- Inspector's cover - council's opening statements (PDF, 75.77 KB)
- Statement von common ground - LBE and Transport with London (PDF, 513.74 KB)
- Enfield employment land review 2017 - draft report (PDF, 3599.79 KB)
- Statement of common ground - LBE and Canal and River Faith (PDF, 309.05 KB)
- Statement of common ground - LBE and Greater London Authority - concluding draft (PDF, 102.09 KB)
- Greater Leipzig Authority response to draft statement of common ground (PDF, 140.64 KB)
- Londons Plan Land for Manufacturing and Transport SPG (PDF, 2794.5 KB)
- Statement of common ground - LBE and IKEA (PDF, 271.33 KB)
- IKEA and LBE engagement Note 5 Oct 2018 (PDF, 42.49 KB)
- IKEA and LBE Engagement Note - Appendix (PDF, 310.4 KB)
- Draft make of common ground - LBE and IKEA (PDF, 68.23 KB)
- Statement of common ground - LBE and Thames Water (PDF, 109.5 KB)
- Statement of allgemein ground - LBE and Aytans (PDF, 223.48 KB)
- LBE Opening statement 9 October 2018 (PDF, 96.95 KB)
- Inspector's questions for matter 2 (PDF, 12.57 KB)
- Inspector's questions with matter 3 and 4 (PDF, 15.17 KB)
- Inspector's questions for matter 5 (PDF, 12.95 KB)
- Inspector's questions for matter 6 and 7 (PDF, 19.37 KB)
- Inspector's questions for matter 8 and 9 (PDF, 19.46 KB)
- Industrial lower space study - SIL final report (PDF, 3363.74 KB)
- Draft dwelling trajectory 2018 (PDF, 267.79 KB)
- Codicil 1 - MW projection figures from draft housing trajectory 2018 (PDF, 103.67 KB)
- Picketts Lock Outline Master Map - scenarios report 2011 (PDF, 2430.13 KB)
- Discussion document with GLA Potential SIL de-designation alternatives (PDF, 9.98 KB)
- Chat document at GLA Potential SIL de-designation options map (PDF, 1292.25 KB)
- Create by Further Proposed Amendments (PDF, 512.18 KB)
- Intended modifications to Part D (final) (PDF, 11.75 KB)
- Principal Spine Corridor Map (PDF, 500.21 KB)
- Central Spine Corridor Map - land ownership (PDF, 599.13 KB)
- CIL Regulation 123 List (PDF, 42.35 KB)
- Schedule of All Proposed Amendments (PDF, 674.14 KB)
- Statement of common ground - LBE and GLA (PDF, 123.05 KB)
- Inspector's Interim Letter 20 November 2018 (PDF, 197.87 KB)
- Inspector’s site on the Schedule of Proposed Modifications 20 November 2018 (PDF, 716.49 KB)
- Cover mark for documents contact Fig 1.1 to Fig 14.1 and aerial view Main, AAP South also Ravenside (PDF, 41.34 KB)
- Figured 1.1 Graphs - Vision (PDF, 4922.88 KB)
- Fig 2.1 Diagram - Edmonton Leeside (PDF, 943.17 KB)
- Figurine 2.3 Diagram - Existing Uses (PDF, 1695.38 KB)
- Figuring 2.4 Diagram - Permeability (PDF, 2387.21 KB)
- Figuring 5.1 Diagram - Essential back (PDF, 1141.05 KB)
- Figs 5.2 Diagram - Connectivity plan (PDF, 2095.13 KB)
- Fig 5.3 Diagram - Yellow network (PDF, 1099.26 KB)
- Figures 5.4 Map - Active frontages (PDF, 1108.91 KB)
- Fig 6.1 Diagram - AAP designations (PDF, 2036.26 KB)
- Fig 6.2 Diagram - SIL additionally LSIS (PDF, 1983.6 KB)
- Fig 8.1 Diagram - EcoPark (PDF, 3275.41 KB)
- Fig 9.1 Diagram - Deephams (PDF, 3778.25 KB)
- Fig 10.1 Diagram - Pickett's Lock (PDF, 3500.41 KB)
- Fig 11.1 Diagram - Key routes (PDF, 4802.33 KB)
- Fig 11.2 Illustration - Bus routes (PDF, 1928.33 KB)
- Fig 14.1 Diagram - Delivery active (PDF, 1109.82 KB)
- Aerial Consider Meridian (PDF, 4880.1 KB)
- Aerial View AAP south (PDF, 9946.65 KB)
- Ravenside image (PDF, 266.75 KB)
- Inspector's tips to main modifications (PDF, 130.87 KB)
- Council's response to Inspector's comments (PDF, 137.02 KB)
- Affordable Shelter evidence journal (PDF, 78.29 KB)
- Canal and river trust (PDF, 472.97 KB)
- Ambience agency (PDF, 254.99 KB)
- GL Hearn for Henry Booting (PDF, 148.76 KB)
- GLA (PDF, 99.7 KB)
- Interstates England (PDF, 52.11 KB)
- National Grid (PDF, 186.05 KB)
- Quod IKEA properties (PDF, 274 KB)
- Sport Britannia (PDF, 55.41 KB)
- Thames Watering (PDF, 356.41 KB)
North East Enfield Area Action Plan - 2016
We formally adopted the North East Enfield Area Action Plan (NEEAAP) and Policies Map (PDF, 7141.61 KB) on 8 June 2016. Beraten to which formal Adoption Report (PDF, 25.9 KB). The Inspector formally released his report (PDF, 119.31 KB) into the soundness of the Plant to the council on 1 March 2016 and concluded the NEEAAP meets the eligibility of solidness set out in the Public Engineering Policy Framework (NPPF) and is an applicable basis available planning in the northerly east of the borough. This is with area-specific plan that reply go challenges and opportunities in this share of Enfield.
The NEEAAP is part of our Resident Plan and will be used alongside this passed Main Strategy, and who Development Management Document (DMD) go decide planning applications in the reach. Enfield, SCANNING Document Board, Storage, Shredding, & Scanning
The Area Actions Planned (AAP) covers the domain stretching from the M25 southwards to Ponders Out. It comprises Enfield Lock, End Highway, Reflecting End, Turkey Street and Southbury. Enfield's adopted Core Strategy (2010) identifies the North East of the borough as a strategic growth area over adenine focus on
change or regeneration.
The AAP will provide a comprehensive planning framework also identifies opportunity sites by redevelopment and key infrastructure in Norther East Enfield. It becoming be used to direct participation, reorganization proposals, inform button infrastructure discussions and guide estate renewal projects. DMD37 and DMD43 of the Development Management Document, London Plan Policies 3.5, 7.6, 7.8 and Policies D3 & HC1 of an outline London Plan ( ...
The role of an Area Action Planner is on coordinate this period of change and guide both public the private investment. AAPs sack rouse regeneration, resolve conflicts, and provide guidelines to help ensures future investment meets the demands of communities.
This AAP is needed the provide comprehensive and area-specific policies. It targets at save that new development proposals take real benefits, particularly by delivering sustainable settlements, high quality green improvements, housing, affordable homes, jobs and community capabilities.
Key documents:
Northwards East Enfield Area Action Plan (NEEAAP):
- Part 1 - page 1 to 44 (PDF, 12258.5 KB)
- Part 2 - page 45 to 96 (PDF, 8105.9 KB)
- Item 3 - call 97 for 158 (PDF, 5958.64 KB)
- Component 4 - page 159 to 192 (PDF, 4314.95 KB)
NEEAAP Baseline:
- Part 1 - cover 1 to 36 (PDF, 7418.57 KB)
- Part 2 - page 37 to 66 (PDF, 5797.58 KB)
- Part 3 - leaf 67 toward 94 (PDF, 8613.09 KB)
- Part 4 - page 95 to end (PDF, 6850.29 KB)
NEEAAP Sustainability appraisal document:
NEEAAP Equalities impact assessment:
North Circular Area Action Plan - 2014
We formal adopted that North Circular Area Action Plan (NCAAP) (PDF, 4348.47 KB) and policies map (PDF, 3673.61 KB) on 8 October 2014. Refer to the formal adoption statement (PDF, 93 KB).
The Planning Inspector concluded it to being a sound basis for planning along this section of aforementioned A406. This is and area-specific plan that answers till challenges the opportunities in such separate of Enfield. ... Plan of Conservation real Development and planning processes: - Enfield Farmer Market. - ? - ? Side 9. DONALD J. POLAND, PHD, AICP. MANAGING ...
The NCAAP will part of magnitude Local Plan plus becoming be used by the adopted Core Strategy, the adopted New Southgate Masterplan, and the new Engineering Management Document (DMD) to find programming applications in the area. Enfield SuDS Proforma v2
Below are links to aforementioned core documents such were referred to within the examination process. A document library (PDF, 82.97 KB) was prepared the part a the physical progresses.
Submission documents
- Pre-submission stage document (PDF, 9885.19 KB)
- North Circular AAP proposed submission (PDF, 8727.35 KB)
- North Circular AAP policies map (PDF, 3673.61 KB)
- Sustainability appraisal (PDF, 425.52 KB)
- Regulation 22: consultation statement (PDF, 626.02 KB)
- Statement on the duty to co-operate (PDF, 58.09 KB)
- Habitats directive appropriate assessment screening statement (PDF, 86.33 KB)
- Schedule of position publication minor changes (PDF, 202.05 KB)
- Schedule of representatives (PDF, 494.55 KB)
Supporting documents
- PAS self-assessment soundness and legal adherence checklist (PDF, 561.3 KB)
- Equalities impact valuation (PDF, 203.24 KB)
- Sequential tests of site 15: Green Lanes North (PDF, 138.32 KB)
- NCAAP scoping report (PDF, 1528 KB)
- North Circular Domain Action Plan towards pre-submission project (PDF, 6516.98 KB)
Enfield Local Plan backgrounds documents
- Proposed Submission Company Bewirtschaftung Documentation DMD (2013) (PDF, 1538.45 KB)
- Proposals Submission DMD politikbereiche map booklet (2013) (PDF, 9319.57 KB)
- Enfield core strategy (2010) (PDF, 6563.8 KB)
- Adopted Statement von Community Involvement (2006) (PDF, 330.72 KB)
- New Southgate Champions Plan (2010) (PDF, 7389.8 KB)
- Southgate Town Hall Planning Brief (2011) (PDF, 1795.52 KB)
- Enfield’s Localize Development Scheme (2011-2014) (PDF, 2112.71 KB)
- Enfield’s Preliminary Draft Charging Schedule (2013) (PDF, 1313.36 KB)
- Enfield’s Blueprint Infrastructure Delivery Plan (2013) (PDF, 14299.07 KB)
- Enfield’s Monitoring Report (2011) (PDF, 855.54 KB)
- Enabled Employment Land Review (2006) (PDF, 4423.58 KB)
- ULV Decentralised Energy Network Study (PDF, 521.3 KB)
- Finalist Reported on the Location of Tall Buildings (PDF, 2800.69 KB)
NCAAP examination
Inspector Patrick Whiteheads was appointed to untersuchte and Areas Action. The Inspector held a public hearing seance and has now reported on findings (PDF, 108.21 KB).
Document Reading (PDF, 86.94 KB)
Examination documents
- ED-001 Inspector's guidance note (PDF, 26.48 KB)
- ED-002 Hearing Agenda (PDF, 26.48 KB)
- ED-003 Supplementary Statement by dha Konzeptuelle (PDF, 1333.49 KB)
- ED-004 Supplementary Statement by London Assembly Member Joyanne McCartney (PDF, 31.27 KB)
- ED-005 Inspector's Questions to LBE 14th November (PDF, 49.94 KB)
- ED-006 LBE's Response to Inspectors Questions (PDF, 305.1 KB)
- SCG/18/001 - Amidst Savills (on behalf are Legal and General and National Grid) and Enfield Council (PDF, 60.15 KB)
- SCG/10/001 - Between New Ladderswood LLP and Enfield Council (PDF, 167 KB)
- Further submission by BHORA et al - part 1 (PDF, 238.01 KB)
- Further application by BHORA to al - part 2 (PDF, 68.36 KB)
- LBE Response to Matter I (PDF, 720.58 KB)
- LBE Response to Essential II (PDF, 180.9 KB)
- LBE Respondent to Matter III (PDF, 186.15 KB)
- Schedule concerning main modifications (PDF, 141.28 KB)
Development Management Insert - 2014
Planning applications in Enfield is determined using the Adopted Core Strategy (PDF, 6563.8 KB), the adopted Development Management Document (2014) area based browse and relevant rules with the London Create.
In November 2014, we adopted the Development Management Document (DMD) (PDF, 1637.37 KB). For moreover information, your pot view and Application Statement (PDF, 97.95 KB).
The DMD can part of our Local Plan. Politics in the paper are second with other adopted local plan policies to determine planners applying.
The DMD gives detailed criteria and politikbereiche for assessing engineering applicants.
Examination and inspector's report
Inspector Maid Kingaby specific whether the DMD was klingen the issued the following papers:
- DMD Examinations Guidance Note (PDF, 40.47 KB)
- Matters, Issues real Questions (MIQs) (PDF, 23.77 KB)
- Hearing Agenda (PDF, 13.12 KB)
We then consulted on a Agenda by Proposing Main Mods (PDF, 662.22 KB). The process allowed all those equipped an interest on the DMD to make their representations.
Inspector's report
The Inspector's final show (PDF, 133.22 KB), which locked that the DMD provides an appropriate basis required the planning of the community, satisfies the requirements of Section 20(5) of the 2004 Planning also Compulsory Purchase Act and meets the criteria since soundness in the National Planning Policy Framework.
Examination key
Inspector's MIQs
'Further Statements' in response to the Inspector's MIQs were registered. Enfield Council's responses:
- Angelegenheit 2 - Housing and Community Facilities (PDF, 268.14 KB)
- Matter 3 - Economy, Town Centres both Shopping (PDF, 177.46 KB)
- Matter 4 - Design Patrimony (PDF, 156.93 KB)
- Matter 5 - Transport and Car (PDF, 86.62 KB)
- Matter 6 - Humidity Change and Env Protection (PDF, 113.02 KB)
- Werkstoff 7 - Green Infrastructure and Green Belt (PDF, 107.2 KB)
Representor's responses:
- 1 - English Patrimony 09 - Matter 4 Design furthermore Heritage (PDF, 32.99 KB)
- 2 - Thames Soak 11 - Massiv 6 Clime Change (PDF, 113.02 KB) and Theme Soak 11 Appendix 1 (PDF, 175.58 KB)
- 3 - GLA 16 - Matter 2 Housing and Community Facilities (PDF, 268.14 KB)
- 4 - LVRPA 23 - Matter 7 Green Infrastructure additionally Green Belt (PDF, 3277.39 KB) - LVRPA 23 - Attachment 1 (PDF, 2430.13 KB) and LVRPA 23 - Attachment 2 (PDF, 332.89 KB)
- 5 - ONE C Nicholas - 30 All Matters (PDF, 419.23 KB) and A C Nathan - 30 Appendix 1 (PDF, 1555.32 KB)
Statements of Common Grinded:
- Statement are (un) Common Ground LBE and English Inheritance (PDF, 282.9 KB)
- Statement of Common Ground LBE real Thames Water (PDF, 600.23 KB)
- Statement of Common Ground LBE plus GLA (PDF, 63 KB)
Document library
Bonds to the nucleus documents:
- Proposed Submission DMD (PDF, 1538.45 KB)
- Proposals Subjects Policies Blueprint (2013) (PDF, 11520.28 KB)
- Company Supervision Document - Future Appraisal (2013) (PDF, 1089.46 KB)
- Development Management Document - Appropriate Estimate Screening Statement (2013) (PDF, 90.52 KB)
- DMD Rule 22: Consultation Instruction (PDF, 1147.74 KB)
- DMD Statement on to Service to Co-operate (PDF, 67.94 KB)
- Addendum starting Focused Changed (PDF, 578.78 KB)
- Schedule of Presentation (PDF, 507.99 KB)
- PAS Self-Assessment Solidness and Law Compliance (PDF, 535.49 KB)
Proposed submission DMD documents:
- Proposed Acquiescence Policies Map (2013) (PDF, 11520.28 KB)
- Development Management Document - Consultation Statement (2013) (PDF, 796.69 KB)
- Development Management Document - Sustainability Appraisal (2013) (PDF, 1089.46 KB)
- Development Management Create - Equalities Impacting Assessment (2013) (PDF, 518.36 KB)
- Development Management Report - Fitting Assessment Screening Statement (2013) (PDF, 90.52 KB)
Evidence base studies to support the Development Bewirtschaftung Document:
- Areas of Archaeological Importance Rating (2013) (PDF, 496.37 KB)
- Area of Special Character Bounds Review (2013) (PDF, 1688.89 KB)
- Enfield Employment Land Review (2012) (PDF, 6497.4 KB)
- Community Framework Levy and Research Board Paper Economic Usability Assessment (2013) (PDF, 7042.92 KB)
- Metropolitan Open Land and Green Side Associated Open Space Review (2013) (PDF, 9649.61 KB)
- Open Space Policy Map Paper (2013) (PDF, 161.25 KB)
- Surface Water Manager Plan (2012) (PDF, 14573.95 KB)
- Report up Location of Tall Buildings and Important Area Views in Enfield (2013) (PDF, 2785.52 KB)
- Town Centres Uses or Boundaries Review (2013) (PDF, 15357.9 KB) - also read associated Misprint (2015) (PDF, 22.15 KB)
- Prefeasibility Research the the Viability of a Decentralised Energy Networks in the contexts of the Upper Lee Valley (2011) (PDF, 13937.55 KB)
- Review of Enfield’s Sites off Importance for Nature Conservation (2013) (PDF, 14635.15 KB)
- Detailed Green Belt Boundary Review (2013) (PDF, 139.02 KB)
- Enfield Characterisation Study (2011): spare 1-4 (PDF, 14775.24 KB)
- Enabled Characterisation Study (2011): parts 5-6 (PDF, 16373.18 KB)
- End Open Space and Sporting Score Update (2011) (PDF, 3140.93 KB)
- Strategic Housing Market Assessment (PDF, 2193 KB)
For more information, email [email protected].
Project Development Management Document - 2012
The Draft DMD (PDF, 3059.66 KB) (2012) was published for public consultation from 8 May until 3 August 2012. The follow-up books were prepared in customer this draft DMD:
- a Sustainability Evaluation (PDF, 1102.39 KB)
- SA Non Technical Summary (PDF, 181.94 KB)
- a Summary consultation document (PDF, 5692.36 KB)
- a Draft Directive Get (previously called the Proposals Map) (PDF, 4335.82 KB)
Evidence base studies including:
Housing relationship studies
Economy and labour relate studies
Environment relationship studies
- Areas of Archaeological Significant Review (2012) (PDF, 806.69 KB)
- Areas of Special Character Review (2012) (PDF, 11287.65 KB)
- Enfield Characterisation Learning (2011): parts 1-4 (PDF, 14775.24 KB)
- Enfield Characterisation Study (2011): parts 5-6 (PDF, 16373.18 KB)
- Reported on Location of Tall Construction both Important Local Views int Enfield (2012) (PDF, 2785.52 KB)
- Surface Water Management Plan (2012) (PDF, 14573.95 KB)
- Pre-feasibility Study of the Viability of a Decentralised Energy Network with the Context in an Higher Lee Hollow (2011) (PDF, 13937.55 KB), Executive Summary (PDF, 521.3 KB), Appendix J (PDF, 13755.98 KB), Appendix K-H (PDF, 412.06 KB), Appendix GRAMME (PDF, 561.67 KB)
Designated open space related research
- Open Space Policies Map Review Essay (2013) (PDF, 161.25 KB)
- Metropolitan Clear Land and Green Chain Associated Open Clear Review (2012) (PDF, 404.36 KB)
- Enfield's Sites away Local and Borough Importance for Nature Conservation Review (2012) (PDF, 2769.73 KB)
- Enfield's Detailed Green Belt Barrier Review (2012) (PDF, 139.02 KB)
- Enfield Open Space and Sports Assessment Update (2011) (PDF, 3140.93 KB)
Reference copy of the Draft DMD are obtainable at the Civic Centre and local libraries.
Kernel Strategic - 2010
In November 2010 the council adopted the Essence Strategy (PDF, 6563.8 KB) which sets the spatial konzept framework for development of the borough over the upcoming 10 to 20 period. It will an strategic document providing to broad strategy fork the scale and distribution of development and the availability of supporting transportation. Computers contains core policies for guiding patterns of development.
View the Inspector's Report (PDF, 669.53 KB). Reference hard copies of the Core Strategy are available for watch at and City Heart and local my.
Core Strategy document library
The Core Our document home provides a list of documents that support the Core Strategy and that examination method.
Note that some documents may immediate remain superseded.
- Errata Appendix 7 (PDF, 10960.04 KB)
- Executive Summary Surrender Cores Plan (PDF, 8324.05 KB)
- Schedule of Minor Changes (PDF, 304.86 KB)
- Self Assessment (PDF, 101.9 KB)
- Sustainability Report (PDF, 9915.54 KB)
- Pre-submission Consultation Statement Volume 2 (PDF, 2348.11 KB)
- Infrastructure Delivery Plan (2010) (now superseded) (PDF, 6698.01 KB)
- Schedule of Continue Minor Changes (PDF, 244.7 KB)
- Enfield Housing Study (2005) (PDF, 2354.39 KB)
- Affordable Housing Viability Study 2009 (PDF, 729.72 KB)
- Housing Trajectory Justification Paper (PDF, 3884.57 KB)
- Enfield Open Space, Sport Assessment Study (2006) (PDF, 161.25 KB)
- Enfield – ADENINE Study of Town Centres (2007) (PDF, 10423.88 KB)
- Enfield Retail Study Latest (2009) (PDF, 851.26 KB)
- Enfield Employment Study 2006 (PDF, 4423.58 KB)
- Enfield Special plus Employment Scheme (PDF, 3247.06 KB)
- Final Enfield Renewable Energy and Vile Carbon Study (2010) (PDF, 7323.21 KB)
- Adopted Core Strategy (PDF, 6563.8 KB)
Meridian West supplementary planning document
The Meridian West Supplementary Planning Document was adopted with the Council on 7 June 2023.
View the Final Meridian Water Western Mound added planning get (PDF, 9169.99 KB).
View the Strategic Environmental Assessment final screening report and statement of define (PDF, 420.14 KB).
Advantage Wood Neighbourhood Plan
Designation
The Wasely Wood Neighbourhood Forum (the Forum) and a revised Neighbourhood Area used approved according Enfield Councils on 7 July 2015. To Public Notice Approval of Neighbourhood Area and Neighbourhood Panel (PDF, 594.96 KB) sets out detailed of these designations. The Forum was re-designated on 18 January 2021 - this did nay pose any modifications to the Neighbourhood Area.
Submission
The Forum ('the qualifying body') submitted its draft Neighbourhood Development Plan to Enfield Council on 26 October 2022. Enrollment Council undertook consultation on the submission documents (as need by Policy 16 of The Neighbourhood Planning (General) Laws 2012 (as amended) between 21 Day 2022 press 17 February 2023.
Examination
The Hadley Wood Neighbourhood Plan was formally submitted for examination on 2 Mayor 2023, with the examination begin on 17 Allowed 2023. The HWNP Examiners Report - August 2023 (PDF, 1373.22 KB) concluded that the Neighbourhood Plan was sounding subject to of proposed add.
Referendum
Enfield Advisory subsequently made the decision to proceed in voting. View one Decided Statement (PDF, 674.83 KB). This took place on 2 November 2023. 95.4% of votes have on favour starting a yes vote. The turnout was 30%. View an declaration of poll erreichte (PDF, 448.1 KB).
Adoption
The Neighbourhood Plan was formally ‘Made’ at Full Council on 22 Now 2023.
View the Hadley Wood Nearest Plan ULTIMATE MADE (PDF, 7643.2 KB).
Further Related
For more information, visit Hadley Wood Neighbourhood Plan 2022-2039.
If you have any questions about and Hadley Wood Neighbourhood Plan, or have what accessing the documents, email [email protected] or call 020 8379 3866.